Integrated Plastic Lifting Pump Station for Basement 100L
Let Our Industry Experts Create Your Tailored Solution! Contact US !
Products Category
Tag list
- Product Details
-
Model Dimension Single Pump Dual Pump 65L 550*435*490mm 100L 550*525*570mm 200L 702*677*666mm 300L 770*705*770mm 500L 924*924*866mm 1500L 1580*1220*1040mm 1. Product Overview
The integrated plastic lifting pump station is a prefabricated pumping unit designed for basement drainage, sewage, and wastewater lifting. It integrates the collection tank, submersible pump, piping system, valves, level sensors, and control cabinet into one compact structure. The product is made of high-strength polyethylene (PE) , featuring excellent corrosion resistance, durability, and long service life.
2. Applications
- Basement sewage and wastewater lifting
- Residential, commercial, and public building drainage
- Underground garages, shopping malls, and stations
- Areas with low drainage elevation where gravity discharge is not possible
- Replacement of traditional concrete sewage pits3. Main Features
1. Integrated Design – Combines tank, pump, pipeline, and control system in one unit.
2. Corrosion Resistant – High-quality plastic materials resist sewage corrosion and extend service life.
3. Easy Installation – Prefabricated structure reduces on-site construction work.
4. Sealed and Odor-Free – Fully enclosed tank prevents odor leakage.
5. Automatic Control – Intelligent liquid level control with alarm protection system.
6. Low Maintenance – Convenient inspection cover and anti-clogging design.
7. Customizable – Various sizes, pump configurations, and control options available.4. Technical Parameters
- Tank Material: PE plastic
- Tank Volume: 65L – 500L (customizable)
- Pump Type: Submersible sewage pump
- Power Supply: 220V / 380V, 50Hz
- Flow Rate: 1 – 30 m³/h
- Head Lift: 5 – 40 m
- Inlet/Outlet Size: DN50 – DN300
- Control System: Automatic level control with alarm5. Installation Guide
1. Foundation Preparation – Ensure a flat and solid concrete foundation.
2. Positioning – Place the pump station in the designated basement location.
3. Pipeline Connection – Connect inlet pipe, outlet pipe, and ventilation pipe securely.
4. Electrical Connection – Connect the control cabinet to the pump and sensors according to wiring diagram.
5. Testing – Fill the tank with clean water and check pump start/stop functions.
6. Backfill and Sealing – Ensure all connections are sealed to prevent leakage.
- Control System: Automatic level control with alarm6. Operation Instructions
- The pump will automatically start/stop according to water level sensor signals.
- In case of high water level, the alarm system will activate.
- Manual operation is available in case of emergency or maintenance.7. Maintenance and Safety
- Regularly check pump operation and electrical connections.
- Clean tank and pipeline periodically to prevent clogging.
- Inspect and replace level sensors if malfunction occurs.
- Always disconnect power supply before maintenance.
- Do not open inspection cover during operation.8. Warranty and Service
The integrated plastic lifting pump station is covered by a standard 12-month warranty against manufacturing defects. Extended service and spare parts are available upon request.
Integrated Plastic Lifting Pump Station for Basement 100L
Let Our Industry Experts Create Your Tailored Solution! Contact US !
Products Category
Tag list
Request a Quote
We will contact you within one working day. Please pay attention to your email.


















